title icon

Manual

Download printable manual.

INTRODUCTION: pp (1-3)

A. The Pneumatic Stabilizer
B. Principles of the GG System
C. Power

DESCRIPTION OF GYRO-GALE: pp (3-7)

A. Air Tank
B. Filter/Lubricator Unit
C. Control Unit

  • 1. Gyroscope
  • 2. Rotary Valve
  • 3. Amplifiers
  • 4. Distribution Block
  • 5. Gyro Pressure Regulator

D. Fins & Driving Mechanism
E. Bridge Control

INSTALLATION OF GYRO-GALE: pp (9-13)

A. Air Tank Installation
B. Filter/Lubricator Unit Installation
C. Control Unit Installation
D. Electronic Gyro Installation
E. Fins & Driving Mechanism Installation
F. Tab-Fin Installation
G. Bridge Control Installation
H. Compressor on Engine Installation

  • 1. GM Engines
  • 2. 3208 Cat Engine
  • 3. 3609 Cat Engine
  • 4. 120 & Ford Lehman Engine

I. Heat Exchanger Installation
J. Air Dryer Installation

INTERCONNECTING TUBING & FITTING: pp (14-15)

A. Bridge Valve
B. Air Tank
C. Filter/Lubricator Unit
D. Control Unit
E. Compressor
F. Heat Exchanger
G. Air Dryer

OPERATING ELECTRONIC GYRO: pp (18)

A. Sensitivity
B. Pressure
C. List

SERVICE & ROUTINE MAINTENANCE: pp (20-21)

A. Stabilizer Maintenance
B. Replacement of Complete Filter Package
C. Replacement of Fin Seal Kit
D. Every 30 Days

Our engineers are available 24/7 for free over the phone Technical Support; and if requested, will travel to just about anywhere around the world to the vessel’s location to perform: installations, supervision, yearly maintenance, and system testing & inspection.

Main Office: (772) 283-1711
info@gyrogalestabilizers.com

Zeyad Metwally, VP Engineering: (772) 285-7205
zeyad@gyrogalestabilizers.com

Asmaa Metwally, Operations Manager: (772) 209-2142
asmaa@gyrogalestabilizers.com