Installation of the GG System & Air Supply Package


The installation of the system ls very simple and normally takes about 3-4 days for the complete installation and sea trial.

Procedure for the installation of:

    1- Air tank
    2- Filter/lubricator/regulator unit
    3- Control unit
    4- Fin unit
    5- Bridge control
    6- compressor
    7- Heat exchanger
    8- Air dryer
    9- Inter connecting tubing end fittings
1-Air Tank

The air tank is best installed over head. In this case the tank is bolted to a wooden platform and the assembly ls then installed over head any where ( mostly in the engine room ).

2-Filter/Lubricator/Regulator Unit

Install the filter/lubricator/regulator on any vertical partition or bulkhead. one clearance below the bottom of the unit must be at least 8" to allow disassembly. The unit should be located in an easily accessible position to check the oil level and top at as required.

3-Control Unit

Install the control unit on a transverse bulkhead or partition so that the unit is facing either forward or aft. the position of the control unit should be selected as close as possible to the vessel center line so that the length of the tubing running to the fin units are short and almost of the same length. Also it should be as high as possible.