The installation of the fin units requires that the vessel be
hauled out. The following is a step by step for the
complete installation of the fin units:
a- Locate convenient positions for the fins within the middle
third of the water line. For two fins system, the fins are
located at least 12' from the propeller. For four fins
system or more , the fins will be placed at least 8' apart and
the most aft will be at least 12' from the propeller. Avoid
locating the fins in curved position of the hull such as close
to bow or stern where the water flow is essentially not
parallel to the keel . If however, such position is essential,
then the direction of the water flow at that position has to
be determined to locate the neutral position of the fin.
b- Using a wooden template of the base plate, position the
template against the outside of the hull at the desired
location. The shaft of the fin should be almost perpendicular
to the hull. The tip of the shaft at this position must be
at least 8' within a vertical line from the widest point of
the hull as well as the keel line. This arrangement insures
that the fins will be protected when the vessel is being
docked or hauled.
c- Using the template. drill holes 9/16" for the holding
bolts ( three ) and the hole for the center shaft 2"
diameter.
d- Assemble the outer plate on the hull. Note that the three
holding bolts should be of the same length as these will be
used to align the inner base plate.
e- Assemble the inner base plate and use the length of the
holding bolts to insure that the inner and outer plate are
parallel. Tighten the nuts or the holding bolts and be sure
that the drive shoe is moving freely and without any binding.
f- Mark the excess length of the tube ( 1 3/4" ) above the
drive shoe. Disassemble the unit and cut off the excess
length.